At a time when developers are looking for ways to build assets at a cost that can be recovered by obtaining an acceptable return on investment, it is necessary to focus more on the full cost of the project rather than focus on the cost Preliminary only, which will stimulate the required change in terms, conditions and cooperation between stakeholders. In this report, the industry's senior executives present their views on a range of topics, including alternative delivery models and innovative building practices. Mark Andrews, CEO of Ling O'Rourke Middle East, highlights the importance of modular construction, saying: Our innovations in the UK lie in the increasing use of off-site construction (i.e. planning, design, construction, manufacture, and assembly of building components at their non-final location with the aim of Facilitate rapid and efficient construction of a permanent structure (-Design for Manufacture and Assembly DfMA) .This method uses digital engineering, building information modeling, construction manufacturing capabilities and logistics - which facilitate on-site assembly.
Tim Barr, partner in charge of capital projects at Deloitte Global, and CEO of the consulting services division in Deloitte Middle East, said: The ambition and volume of investments in projects Infrastructure and m ...