Al-Sumaiti said that it follows the decision of the Joint Executive Committee on Al-Khafji Operations, according to which the suspension of all oil production from the Al-Khafji joint field and its facilities for a period of one month as of June 1 2020, the committee decided to resume production from July 1.
He stressed that the reproduction was achieved thanks to the efforts of all national cadres working in the Al-Khafji Joint Operations Area, and overcoming them to all the challenges witnessed in the region and the world at large in terms of emerging health conditions. < / p>